Client: Woodridge Century Plaza
Lead Agency: City of Los Angeles

The Proposed Project would involve the construction of a mixed-use development that would include two 49 story, 570-foot buildings. The buildings would be positioned on the north and south sides of a two-acre publicly accessible plaza area, "the Plaza," surrounded by ground-level retail and restaurant uses.  The proposed mixed-use development would consist of residential, hotel and office uses, as well as retail and restaurant uses.

The Proposed Project's south building would be exclusively dedicated for residential use, consisting of 130 luxury condominium units. The Proposed Project's north building would be mixed-use in nature and include 240 hotel rooms, 163 condominium units, and 117,647 gross square feet of office space.  Meeting room and ballroom space would be located below the plaza level between the two buildings. At ground level, the Proposed Project would also include the Plaza, a publicly accessible area approximately two acres in size (including courtyards), accessed from Avenue of the Stars and Constellation Boulevard. Approximately 109,278 gross square feet of retail, restaurant and café space would surround the Plaza.  The Plaza would be pedestrian-friendly, and extensively landscaped, including water features.  The Proposed Project's two main buildings would be constructed in a contemporary architectural style and, coupled with the Plaza surrounded by the Proposed Project's retail, restaurant, and café space, would be designed to create an iconic identity for the Project Site.

The Proposed Project would remove the existing 19-story Hyatt Regency Century Plaza Hotel and associated buildings, as well as all landscaping now located on the Project Site. The existing hotel contains a total 726 hotel rooms, as well as a spa/health club, restaurants, conference rooms, a ballroom, and a lounge.  Construction activities associated with the Proposed Project are expected to begin in June 2011 with an overall time period of approximately three years